PC Sunlight Board Curtain Wall Pressure Plate Installation Method
Jan 28, 2019
After the sun panel is fixed, the aluminum platen is installed. A second rubber strip waterproof seal is placed on the aluminum alloy solar panel curtain wall pressure plate. The upper rubber strip on the aluminum alloy platen is not allowed to break the tower head. The screw spacing for the mounting bead must be between 150 and 200 mm and the position must be at the centerline of the bead. The aluminum alloy sun visor curtain wall pressure plate screws are not allowed to be left blank. The screws must be fastened in place. The fastening force of the fastening screws is consistent. The pressure plate does not allow empty drums. The installation of aluminum alloy sun visor curtain wall plate should be horizontal and vertical. It must be noted that when installing the pressure plate, the screw must be driven from the middle of the pressure plate to the two ends to prevent the pressure plate from arching. The horizontal pressure plate has an opening A50 at the upper portion of each of the partitioning units as a drainage hole to prevent rainwater from entering the pressure plate and draining through the water discharge port at the lower portion of the cover plate.








